High Quality RFID Pallet Tags for RFID Inventory Warehouse Trucking Logistics

Additional Product Parameters

Frequency Chip Waterproof Memory Color
860-960 MHz Alien Higgs-3 IP65 800 bits White
Function Writing Cycle Protocol Coding MOQ
Read and Write 100,000 times ISO18000-6C Laser engraving, painting 1000pcs

RFID Pallet Tags Introduction

RFID pallet tags are a passive RFID transponder customized for pallet management. Encapsulated by Rugged ABS material, with similar size as a clamshell card, but with 4 holes on each corner of the tag, they very convenient to be fixed on the pallet.

They are mainly used for identification and addressing control of the wooden or plastic pallets. Nowadays, they have been widely used for tracking big lot of goods in big companies and logistic industrials, which can dramatically improve the efficiency of the warehouse management.

Product Features:
  • Long reading distance, easy for positioning and tracking.
  • Magnet is available, can be attached to metal surface easily.
  • Passive working mode, no need battery.
  • Easy to operate.
  • Quick, reliable, and has a long life.
Product Applications:

Install the pallet tag on the wooden or plastic pallet, or attached to metal equipment by magnet. Divide the warehouse in grid, and install the fixed reader in different grids. In the system, you can easily found the pallet tag in the range of which reader, and judge which physical area the pallet in, so to track and locate different batch of goods. Therefore, they are widely used in RFID inventory, warehouse, trucking and logistics.

Product Crafts
  • Printing of serial number, barcode or QR code;
  • Logo silk printing; 

Crafts can be customized in accordance with the customer requirements for different products.

Advanced Production Equipment

rfid inlay production
rfid-tag-equipment
Why Choose Us?
Previous slide
Next slide

Additional Information

Delievery
By Express (3~7 days)

Cooperation: FedEx, DHL, UPS, TNT

By Air

About 2 weeks

By Sea

Fast Boat: within a month
Slow Boat: about 50 days

Click Here